Sazeh Tadbiran successfully engineered, fabricated, and erected the iconic entrance space frame canopy for the Tehran Central Railway Station, the busiest rail transit hub in the country. The project began with comprehensive 3D structural, seismic, and snow-load modeling in SAP2000 to design an expansive, welcoming architectural canopy that harmonizes with the historic terminal facade. Based on these computational insights, our engineering team developed a high-rigidity double-layer MERO spatial grid capable of projecting long cantilevered spans with minimal support columns.
As a result of this precision engineering solution, the central station gained a modern, unobstructed passenger drop-off and transit plaza sheltered from extreme seasonal weather. During the manufacturing phase, Sazeh Tadbiran utilized hot-forged CK45 solid spherical nodes and applied multi-layer weather-resistant electrostatic powder coating to combat urban pollution and thermal fluctuations. Every stage—from automated factory welding and ultrasonic NDT checks to modular night-shift lifting—was executed with zero disruption to daily passenger flow and train schedules.
Engineering Proposal & Structural Solution
Engineering Proposal & Structural Solution
The primary engineering objective was to create a monumental, column-free entrance canopy for Tehran Central Railway Station that provides wide weather protection while preserving uninterrupted pedestrian and vehicular traffic flow.
The implemented solution encompassed 3D dynamic load analysis in SAP2000, precision CNC fabrication of hot-forged CK45 spherical nodes, and UV-resistant electrostatic powder coating. By utilizing 100% bolted connections with Grade 10.9 high-tensile bolts and pre-assembled modular sections, Sazeh Tadbiran completed the on-site erection rapidly and safely without any field welding or station downtime.
Project Technical Requirements
Project Engineering Methodology
A streamlined turnkey workflow—engineered for maximum structural safety and zero operational disruption in high-traffic public transit zones.
Analyzed asymmetric snow loads, wind uplift, and seismic forces in SAP2000 to guarantee cantilever stability and deflection control.
Fabricated hot-forged CK45 spherical nodes and automated welded tubular elements with durable, weather-resistant powder coating.
Executed modular ground assembly and rapid crane lifting during scheduled low-traffic windows using 100% bolted connections.
Through this carefully coordinated methodology, Sazeh Tadbiran delivered the Tehran Central Railway Station canopy with outstanding structural precision. The double-layer MERO space frame not only enhanced the architectural identity of the terminal plaza but also provided a robust structural grid for integrating modern cladding panels, rainwater drainage, and high-efficiency transit lighting systems.
Upon completion, the railway terminal gained a durable, high-capacity entrance shelter capable of serving tens of thousands of daily commuters in complete safety.
Erecting a large-span entrance canopy at the busiest railway terminal in the country without disrupting daily train schedules or passenger safety was a major operational challenge. Sazeh Tadbiran’s prefabricated MERO system and 100% bolted modular installation allowed their crew to execute the project with remarkable speed, engineering precision, and zero on-site welding hazards.