Pages Project Details

Production Line Development
for Apex Industrial Group

SteelNova designed and installed a high efficiency production line that improved manufacturing
workflow, increased output capacity, reduced operational downtime.

Sazeh Tadbiran successfully engineered, fabricated, and erected the large-span cantilevered space frame roof structure for the 15,000-seat Shahid Kazemi Football Stadium in Tehran. The project began with advanced 3D aerodynamic wind-uplift and dynamic seismic modeling in SAP2000 to design a sweeping grandstand canopy that shelters spectators without a single front-row column obstructing field visibility. Based on these computational insights, our engineering team developed a high-strength double-layer cantilevered MERO grid anchored securely to the rear stadium superstructure.

As a result of this specialized sports-infrastructure solution, the stadium achieved a modern, FIFA-standard spectator canopy with exceptional structural stiffness and minimal dead weight. During the manufacturing phase, Sazeh Tadbiran utilized heavy-duty hot-forged CK45 solid spherical nodes and high-tensile tubular members protected by UV-resistant electrostatic powder coating. Every stage—from automated factory welding and 100% ultrasonic NDT inspections to high-altitude modular crane lifting—was executed with uncompromising precision and safety.

Engineering Proposal & Stadium Canopy Solution

The project proposal was to to deliver clear insights, identify best opportunities, and support informed strategic decisions.

Sazeh Tadbiran proposed a cantilevered double-layer MERO space frame configuration engineered for high flexural rigidity and aerodynamic stability. Because stadium canopies act like giant airfoils during windstorms, our structural model optimized the spatial truss depth and rear anchor tie-downs to neutralize dynamic flutter and heavy winter snow accumulation.

The implemented solution encompassed 3D dynamic wind-tunnel and seismic simulation in SAP2000, precision CNC fabrication of hot-forged CK45 spherical nodes, and weather-proof electrostatic powder coating. Utilizing 100% bolted connections with Grade 10.9 high-tensile bolts, Sazeh Tadbiran pre-assembled large canopy modules on the ground and lifted them into position rapidly without field welding.

Project Technical Requirements

Engineering a long-projection cantilevered space frame canopy to provide 100% column-free spectator sightlines across the stadium bowl.
Rigorous 3D dynamic wind-uplift, aerodynamic flutter, and seismic load computations in SAP2000 compliant with AISC codes.
High-capacity hot-forged CK45 solid steel nodes and Grade 10.9 bolts engineered to handle high tensile and compressive cantilever stresses.
Integration of stadium floodlighting arrays, acoustic PA systems, and UV-resistant cladding panels directly into the spatial grid.

Project Engineering Methodology

A specialized sports-arena workflow—combining aerodynamic cantilever modeling with heavy-duty CNC fabrication and modular crane lifting.

Aerodynamic & Cantilever Modeling

Analyzed dynamic wind suction, snow drift, and seismic overturning moments in SAP2000 to guarantee cantilever tip stability.

High-Tensile Node Fabrication

Produced heavy-duty hot-forged CK45 nodes and thick-walled tubular chords with full ultrasonic NDT weld verification.

Modular Grandstand Lifting

Pre-assembled 100% bolted space frame sections on the ground and executed synchronized heavy-crane lifting over the stadium tiers.

Through this advanced structural methodology, Sazeh Tadbiran delivered a landmark stadium roof structure that elevates both the architectural profile and operational safety of Shahid Kazemi Stadium. The cantilevered MERO grid not only protected thousands of spectators from sun and precipitation, but also provided a rigid overhead platform for high-powered broadcast floodlights and stadium sound systems.

Upon completion, the 15,000-seat arena gained a durable, low-maintenance structural canopy built to endure decades of exposure to extreme weather and dynamic crowd vibrations.

 

During the final commissioning phase, our structural supervisors verified all rear-anchor pre-tensions, cantilever tip cambers, and high-tensile bolt torques, delivering the stadium roof on schedule.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare