Pages Project Details

Production Line Development
for Apex Industrial Group

SteelNova designed and installed a high efficiency production line that improved manufacturing
workflow, increased output capacity, reduced operational downtime.

Sazeh Tadbiran successfully engineered, fabricated, and erected the monumental 32,000-square-meter space frame roof structure for the Padideh Shandiz Indoor Water Park in Mashhad, standing as one of the largest covered aquatic complexes in the Middle East. The project began with comprehensive 3D elastic, seismic, and snow-load modeling in SAP2000 to create a vast, column-free indoor hall capable of housing towering water slides, wave pools, and suspended recreational attractions. Based on these computational insights, our team designed a high-capacity double and triple-layer MERO spatial grid that maximizes clear interior height and structural efficiency.

As a result of this turnkey engineering achievement, the complex gained an extraordinary unobstructed architectural envelope engineered to withstand both severe winter snow loads externally and highly corrosive, humid chlorine vapors internally. During the manufacturing phase, Sazeh Tadbiran utilized hot-forged CK45 solid spherical nodes and applied multi-stage chemical pre-treatment followed by high-durability electrostatic powder coating. Every stage—from automated factory welding and 100% ultrasonic NDT inspections to modular heavy-crane lifting on-site—was strictly supervised to guarantee international safety benchmarks.

Engineering Proposal & Structural Solution

The primary engineering objective was to cover an unprecedented 32,000-square-meter indoor aquatic arena without intrusive intermediate columns while supporting heavy winter snow loads and suspended mechanical equipment.

Sazeh Tadbiran proposed an optimized multi-layer space frame configuration based on the MERO system, specifically engineered to handle dual environmental extremes: freezing exterior mountain temperatures and constant interior tropical humidity saturated with chloramines. This lightweight spatial grid dramatically reduced seismic mass and foundation loads compared to conventional steel trusses.

The implemented solution encompassed 3D dynamic load and thermal gradient analysis in SAP2000, precision CNC fabrication of hot-forged CK45 spherical nodes, and anti-corrosive electrostatic powder coating. By utilizing 100% bolted connections with Grade 10.9 high-tensile bolts and synchronized modular lifting, Sazeh Tadbiran executed the massive roof installation safely and rapidly with zero field welding.

Project Technical Requirements

Engineering a 32,000 sqm column-free mega-span roof to accommodate high-altitude water slides, wave pools, and unobstructed sightlines.
Dual-environment protection using multi-layer electrostatic powder coating to resist interior chlorine corrosion and exterior thermal cycling.
Rigorous 3D seismic, heavy snow-load, and thermal expansion analysis in SAP2000 strictly compliant with AISC and national building codes.
Precision CNC production of hot-forged CK45 solid steel nodes and Grade 10.9 bolted connections to support heavy suspended HVAC and lighting loads.

Project Engineering Methodology

A mega-scale turnkey workflow—integrating advanced 3D deflection modeling with high-volume CNC manufacturing and synchronized crane erection.

Mega-Span & Snow Load Modeling

Analyzed asymmetric snow drift, seismic forces, and internal thermal differentials across the 32,000 sqm grid in SAP2000.

High-Volume CNC & Coating Line

Fabricated thousands of hot-forged CK45 nodes and tubular members protected by chlorine-resistant electrostatic powder coating.

Synchronized Multi-Zone Lifting

Assembled large spatial modules on the ground using 100% bolted connections, followed by synchronized heavy-crane erection.

Through this comprehensive engineering methodology, Sazeh Tadbiran successfully delivered one of the largest space frame roof structures ever constructed in the region. The multi-layer MERO grid configuration provided exceptional three-dimensional stiffness and an expansive internal plenum, allowing seamless routing of massive dehumidification ducts, aquatic piping, and acoustic systems across the entire 32,000-square-meter hall.

Upon completion, the Padideh Shandiz Indoor Water Park stood as a benchmark of modern spatial engineering, combining monumental scale with uncompromising structural safety.

During the final commissioning phase, our QA/QC engineering team performed exhaustive geometric deflection checks, ultrasonic weld verifications, and bolt torque audits, handing over the entire mega-structure on schedule.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare