Pages Project Details

Production Line Development
for Apex Industrial Group

SteelNova designed and installed a high efficiency production line that improved manufacturing
workflow, increased output capacity, reduced operational downtime.

Sazeh Tadbiran successfully executed the complete structural design, precision CNC manufacturing, and international on-site erection of the massive 28,000-square-meter space frame roof for the Baghdad Water Park. The project began with an in-depth 3D elastic, thermal, and wind-load analysis in SAP2000, addressing the critical architectural goal of spanning vast indoor aquatic attractions without internal columns. Based on these engineering insights, Sazeh Tadbiran designed an optimized double-layer MERO spatial grid tailored to support heavy suspended recreational equipment and complex roof geometries.

As a result of this turnkey solution, the complex achieved a landmark, column-free indoor environment with superior structural rigidity and reduced foundation dead weight. During the manufacturing phase, Sazeh Tadbiran utilized hot-forged CK45 spherical nodes and applied multi-stage electrostatic powder coating to resist extreme indoor humidity and corrosive chlorine vapors. Each stage—from automated factory welding and ultrasonic NDT checks to cross-border logistics and 100% bolted field assembly—was strictly monitored to ensure international AISC compliance.

Engineering Proposal & Structural Solution

The primary engineering objective was to deliver an integrated, large-span spatial roof covering 28,000 square meters of indoor aquatic attractions, ensuring maximum column-free space and long-term structural safety.

Sazeh Tadbiran proposed an advanced double-layer space frame configuration based on the standard MERO system, specifically engineered to withstand constant indoor humidity, corrosive chlorine vapors, and heavy suspended recreational loads. This lightweight structural solution significantly reduced foundation dead weight while accelerating the overall construction timeline.

The implemented solution encompassed 3D elastic and thermal load modeling in SAP2000, automated CNC fabrication of hot-forged CK45 solid spherical nodes, and multi-stage electrostatic powder coating. Through prefabricated modular logistics and 100% bolted field connections using Grade 10.9 high-tensile bolts, Sazeh Tadbiran ensured rapid, zero-weld on-site erection in Baghdad with uncompromising quality.

Project Technical Requirements

Comprehensive 3D analysis of wind, seismic, thermal, and suspended aquatic equipment loads in SAP2000 to guarantee long-span safety.
Engineering an optimized double-layer MERO grid geometry covering 28,000 sqm to maximize column-free indoor recreational space.
Multi-stage chemical pre-treatment and electrostatic powder coating to protect all steel elements against high humidity and chlorine vapors.
Ultrasonic NDT weld inspections, tensile testing, and hardness verification on hot-forged CK45 nodes to ensure strict AISC compliance.

Project Engineering Methodology

A systematic turnkey engineering workflow—from 3D computational modeling in Tehran to precision CNC manufacturing and rapid on-site erection in Baghdad.

3D Structural & Load Modeling

Executed comprehensive 3D elastic, wind, seismic, and suspended aquatic load calculations in SAP2000 strictly compliant with international AISC codes.

In-House CNC Fabrication & Coating

Produced hot-forged CK45 spherical nodes and tubular members with multi-stage electrostatic powder coating to resist extreme humidity and chlorine vapors.

Zero-Weld Bolted Site Erection

Assembled 28,000 sqm of prefabricated MERO components on-site using 100% high-tensile Grade 10.9 bolted connections with zero field welding.

Through this structured turnkey methodology, Sazeh Tadbiran successfully delivered the expansive 28,000-square-meter spatial roof of the Baghdad Water Park with exceptional geometric accuracy. The double-layer MERO space frame configuration provided high structural rigidity while maintaining a lightweight profile, effectively distributing thermal expansion, wind forces, and heavy suspended slide loads across the perimeter supports without obstructing the indoor aquatic attractions.

Upon completion, the Baghdad Water Park gained an iconic, high-capacity architectural envelope engineered for decades of maintenance-free operation in a constantly humid and chlorinated indoor environment.

During the final commissioning phase in Baghdad, our supervisory engineers conducted rigorous dimensional verifications, torque testing on all Grade 10.9 high-tensile bolts, and final electrostatic coating inspections. Every structural node and tubular element met strict international AISC safety benchmarks, completing the project on schedule.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare