Location Kish Island, Persian Gulf
Sazeh Tadbiran successfully executed the complete structural engineering, precision manufacturing, and on-site erection of the large-span roof for the New Passenger Terminal at Kish International Airport. The project began with comprehensive 3D elastic and dynamic modeling in SAP2000, addressing the critical architectural requirement of bridging a massive 60-meter clear span without any intermediate supporting columns. Based on these computational insights, our engineering team designed a high-capacity double-layer MERO space frame grid tailored to withstand severe coastal wind loads and seismic forces while maintaining architectural lightness.
As a result of this engineering solution, the terminal achieved an expansive, unobstructed interior concourse with significantly reduced structural dead weight and ample plenum space for integrated airport HVAC and MEP routing. During the fabrication phase, Sazeh Tadbiran utilized hot-forged CK45 solid spherical nodes and applied specialized multi-layer electrostatic powder coating to combat the aggressive marine humidity and chloride corrosion of the Persian Gulf. Every stage—from automated factory welding and NDT ultrasonic inspections to 100% bolted modular lifting—was strictly monitored to ensure world-class aviation safety standards.
Engineering Proposal & Structural Solution
The primary engineering objective was to deliver an unobstructed 60-meter clear span across the main passenger terminal concourse while minimizing structural dead weight and ensuring maximum seismic resilience.
Sazeh Tadbiran proposed an advanced double-layer flat space frame grid based on the internationally recognized MERO system. Specifically engineered for the harsh marine climate of Kish Island, the structure was designed to withstand extreme coastal wind loads, high humidity, and airborne chloride corrosion while eliminating the need for intermediate supporting columns.
The implemented solution encompassed 3D elastic deflection modeling in SAP2000, precision CNC fabrication of hot-forged CK45 solid spherical nodes, and multi-stage electrostatic powder coating. By utilizing 100% bolted connections with high-tensile Grade 10.9 bolts, Sazeh Tadbiran ensured rapid modular assembly, seamless integration of airport HVAC and lighting systems within the grid plenum, and strict compliance with international aviation standards.
Project Technical Requirements
Project Engineering Methodology
A systematic turnkey engineering workflow—from 3D elastic deflection modeling to marine-grade factory fabrication and modular on-site erection.
Conducted comprehensive elastic and dynamic load computations in SAP2000 to control long-span deflection across the 60-meter column-free grid.
Manufactured hot-forged CK45 solid spherical nodes and tubular members with multi-layer electrostatic powder coating for severe coastal durability.
Executed 100% bolted ground assembly of space frame sections followed by synchronized crane lifting, eliminating on-site welding delays.
Through this structured methodology, Sazeh Tadbiran successfully bridged the 60-meter clear span of the New Passenger Terminal with exceptional geometric accuracy. The double-layer MERO space frame configuration provided high structural rigidity while maintaining a lightweight profile, effectively redistributing seismic and coastal wind forces across the perimeter supports without obstructing the terminal interior.
Upon completion, Kish International Airport gained a modern, high-capacity architectural envelope engineered for decades of maintenance-free service in the corrosive Persian Gulf climate.
During the final commissioning phase, our supervision team conducted rigorous dimensional checks, torque verification on all Grade 10.9 bolts, and final coating inspections. Every structural node and tubular member met strict AISC and aviation safety benchmarks, delivering the terminal roof on schedule.
Bridging a 60-meter column-free span with a flat space frame in the corrosive marine environment of the Persian Gulf was a critical structural milestone. Sazeh Tadbiran delivered exceptional SAP2000 deflection analysis, precision CNC component fabrication, and durable electrostatic powder coating. Their modular lifting workflow enabled us to complete the terminal roof safely and strictly on schedule.
The geometrical accuracy of the hot-forged CK45 nodes and 100% bolted MERO connections provided the exact structural rigidity required for the new passenger terminal. Furthermore, the double-layer spatial grid created an ideal unobstructed plenum for routing complex airport HVAC and lighting systems without visual clutter.
The engineering precision, component fabrication quality, and rapid erection of the 28,000-square-meter space frame roof far exceeded our supervisory team's expectations. Sazeh Tadbiran demonstrated extraordinary technical commitment throughout every stage of the project.