Pages Project Details

Production Line Development
for Apex Industrial Group

SteelNova designed and installed a high efficiency production line that improved manufacturing
workflow, increased output capacity, reduced operational downtime.

Sazeh Tadbiran successfully executed the complete structural design, precision CNC manufacturing, and on-site installation of 22,000 square meters of curved and geodesic space frame structures for the Janain Karbala Commercial and Recreational Complex. The project began with advanced 3D geometric and elastic modeling in SAP2000 to engineer seamless barrel vaults, entrance canopies, and central atrium domes. Based on these computational insights, our team developed a custom double-layer MERO spatial configuration capable of spanning expansive commercial corridors while accommodating complex architectural curvatures.

As a result of this turnkey engineering solution, the complex achieved a visually striking, column-free architectural skyline with exceptional structural stiffness and optimized steel weight. During the manufacturing phase, Sazeh Tadbiran utilized automated CNC multi-axis drilling to thread hot-forged CK45 spherical nodes at precise compound angles, paired with high-durability electrostatic powder coating for desert climate resilience. Every stage—from robotic tubular welding and ultrasonic NDT checks to cross-border logistics and 100% bolted field assembly—was strictly supervised to ensure international quality benchmarks.

Engineering Proposal & Geometric Solution

The primary engineering objective was to design and erect 22,000 square meters of free-form curved roofs, barrel vaults, and atrium domes that combine iconic architectural aesthetics with long-span structural efficiency.

Sazeh Tadbiran proposed a versatile double-layer space frame system based on MERO technology, engineered to transition smoothly between flat commercial roofs and curved geometric domes. Built to withstand extreme desert temperature fluctuations, sandstorms, and seismic loads, this modular system provided an ideal structural framework for integrating glass skylights and modern cladding envelopes.

The implemented solution encompassed parametric 3D nodal coordinate generation, precision CNC machining of hot-forged CK45 solid steel nodes, and automated electrostatic powder coating. By utilizing pre-coded modular components and Grade 10.9 high-tensile bolted connections, Sazeh Tadbiran ensured rapid, zero-weld on-site assembly in Karbala with millimeter geometric precision.

Project Technical Requirements

Parametric 3D structural modeling and thermal stress analysis in SAP2000 for 22,000 sqm of curved vaults and atrium domes.
Multi-axis CNC machining of hot-forged CK45 spherical nodes to achieve exact compound angles for complex curved geometries.
High-grade UV-resistant electrostatic powder coating engineered to withstand extreme desert heat, thermal cycling, and abrasion.
100% bolted modular field erection using high-tensile Grade 10.9 bolts, enabling rapid multi-zone installation with zero on-site welding.

Project Engineering Methodology

A precision-driven turnkey workflow—from 3D parametric geometry optimization to multi-axis CNC node fabrication and modular site erection.

3D Parametric & Thermal Modeling

Analyzed complex curved geometries, seismic forces, and severe desert thermal expansion loads in SAP2000 according to AISC standards.

Multi-Axis CNC Node Fabrication

Drilled and threaded hot-forged CK45 solid nodes at custom spatial angles, followed by automated tubular welding and electrostatic coating.

Multi-Zone Bolted Site Erection

Coordinated cross-border dispatch and rapid 100% bolted assembly across multiple commercial zones simultaneously without field welding.

Through this advanced engineering methodology, Sazeh Tadbiran successfully brought the complex architectural vision of the Janain Karbala Complex to life. The curved double-layer MERO grids provided exceptional torsional rigidity and seamless support for overhead skylight glazing, transforming the commercial atriums into bright, unobstructed public spaces.

Upon completion, the 22,000-square-meter development stood as one of Iraq’s premier commercial and recreational landmarks, engineered for decades of structural reliability.

During the final handover phase, our engineering supervisors performed comprehensive geometric surveys, bolt torque verifications, and cladding interface inspections, delivering all structural zones strictly on schedule.

Select the fields to be shown. Others will be hidden. Drag and drop to rearrange the order.
  • Image
  • SKU
  • Rating
  • Price
  • Stock
  • Availability
  • Add to cart
  • Description
  • Content
  • Weight
  • Dimensions
  • Additional information
Click outside to hide the comparison bar
Compare